Sam Stewart and Neil Stewart Steen Skybolt
Wing construction continues.  Wing tip bow, drag/antidrag wires and faring up between ribs are all that remain on bottom right hand wing. (I'm
beginning to understand the attraction of a kit)  We have secured materials
for building a tool to drill above mentioned wires and once complete everything will speed up. Still making small parts for the fuselage etc.

Right wing and aileron nearing completion.  Next steps include drilling aileron hinge and bellcrank holes in spar and clear coating entire wing for moisture protection.  Leading edge will have to wait until antenna etc. decisions are made.  Primary hold-up has been manufacturing a tool to drill drag - anti drag wire holes in alignment
through the spars.  Hope to have left wing on table by end of month to start assembly before cool weather stops epoxy use. Fuselage is all tacked
up and ready to finish weld.  Progress has been slower than planned but this is to be expected since aircraft is primarily scratch built.